Tube Cologne
Carlswerk 16.09. - 09.10.2016

Most extensive and expressive Tube installation yet was initially designed as a parasite structure, but had to be suspended from truss construction due to the bureaucratic obstacles. The upper part of the structure, tailored from a flat net surface, consists of larger spaces, while the lower part of the installation, made of net hoses, feature narrow tunnels of entrance and exit. Two parts seamlessly merge in a pulsing spiral of the structure.

 

Index